May/June 2004
--- Click on each pic for a larger view --- Use your back button to come back to this page ---
*** CLICK "RELOAD" FOR MOST CURRENT PICTURES ***
Re-building of the carriage house is moving along. Our brick patios
and walks are in progress.
The new roof is being installed on the saltbox. The carriage
house is ready for roof work to begin.
In the saltbox, the kitchen installation is starting. Only lower cabinets
are installed now, we are
waiting on the granite countertops to be made and installed. Then upper
kitchen cabinets, crown moldings,
cabinet feet, etc, can be installed. Mike Benner did a beautiful
job on the kitchen cabinets, we can't
wait to see the finished kitchen!



New roof going on house after fire, brick patio pavers set for patio
(no mortar yet) - May 23

Carriage house progressing after fire - May 23



Studio pics - studio staircase and downstairs studio, upstairs studio
view - May 23





Kitchen in progress - only lower cabinets installed - Waiting on granite
countertops to be installed,
and then upper cabinets, crown moldings, cabinet feet, etc will be
installed
(Yikes! our wood floors are getting dirty!!!!) - May 23
Shiplap siding installation starting on carriag house exterior - June
9
- GO BACK TO MAIN MENU OF MONTHS -
Home - Shop Patterns - Order a catalog - Place an order - Hook with Wendy - Wools by yellowware - Dealers - Email Wendy
Copyright 2002 Wendy Miller/The Red Saltbox™. All rights reserved.
No part of this webpage or rug designs may be reproduced, printed, or used
in any form without the express written permission of Wendy Miller of The
Red Saltbox™. All designs are protected by copyright and may not
be used for personal or commercial use without written permission.
Please respect and abide by all copyright laws. Thank you.